Search

More roadworks coming to town’s main street

PUBLISHED: 12:26 06 June 2019 | UPDATED: 13:46 06 June 2019

Anglian Water is to carry out two lots of roadworks on Victoria Road in Diss in June and August. Picture: Archant Library

Anglian Water is to carry out two lots of roadworks on Victoria Road in Diss in June and August. Picture: Archant Library

Archant

Embattled motorists are again facing delays travelling along the busiest road in Diss with roadworks set to bring three sets of temporary traffic lights.

Motorists are being warned delays are likely on Victoria Road with two-way traffic signals in operation from Monday, June 10 to Thursday, June 13 as Anglian Water installs a new water connection close to the junction with The Old Coaching Place.

You may also want to watch:

Then on June 24 the company will also be excavating and reinstating a damaged manhole at the junction with Sawmill Road.

Meanwhile on August 5 and 6 temporary traffic signals will be in operation as Anglian Water carry out manhole repairs works on the footpath and carriageway between the Vinces Road and Waveney Road junctions.

The works are the latest on the main A1066 road. In January Anglian Water carried out major sewer works that led to lengthy peak time delays. And last November traffic lights were in operation while a new pedestrian and cycle crossing was installed opposite Diss Leisure Centre.


If you value what this story gives you, please consider supporting the Diss Mercury. Click the link in the yellow box below for details.

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad. Coronavirus is one of the greatest challenges our community has ever faced, but if we all play our part we will defeat it. We're here to serve as your advocate and trusted source of local information.

In these testing times, your support is more important than ever. Thank you.

Most Read

Most Read

Latest from the Diss Mercury